Project detail

COncrete Railtrack Panels for TUnnel Safety

Duration: 01.11.2005 — 31.05.2008

Mark

CORPTUS

Default language

English

People responsible

Units

Institute of Technology of Building Materials and Components
- beneficiary (2008-05-13 - not assigned)

Results

DROCHYTKA, R.; PETRÁNEK, V.; ZACH, J.: Technologie CORPTUS; Technology for placement CORPTUS panels into railtrack tunels. D231d. (ověřená technologie)
Detail

DROCHYTKA, R.; PETRÁNEK, V.; ZACH, J.: Návrh panelu CORPTUS panel; Design of CORPTUS panel. D243, laboratoře VUT FAST. (funkční vzorek)
Detail