Přístupnostní navigace
E-application
Search Search Close
Project detail
Duration: 01.01.2024 — 31.12.2025
Funding resources
Technologická agentura ČR - 2. veřejná soutěž programu SIGMA
- whole funder
On the project
Description in EnglishThe aim of the project is to design, install and commission an experimental forward osmosis (FO) unit as an innovative and effective means of achieving water circularity in industrial plants. Water recovery by osmosis is a passive process, which is associated with a favorable energy balance. Other positive features of FO are resistance to fouling, chemical robustness, high water yields or low operating pressures. Suitable wastewater types for the deployment of FO are characterised by large volumes and low contamination (e.g. from the food industry). The tasks of the project will answer important research and development questions of this progressive technology, in particular a) the areas of applicability, b) the appropriate draw solution, c) the regeneration options for the draw solution.
Key words in Englishforward osmosis; industrial wastewater; circular water management; water reuse; draw solution; zero liquid discharge; recovery
Mark
TQ03000672
Default language
Czech
People responsible
Miklas Václav, Ing. - principal person responsible
Units
Institute of Process Engineering- beneficiary (2024-01-01 - 2025-12-31)