Publication detail

Formwork demands on crane operation

ŠTĚRBA, M. ČECH, D. VENKRBEC, V. MOTYČKA, V.

Original Title

Formwork demands on crane operation

Type

journal article - other

Language

English

Original Abstract

Before the construction outset it is not possible to precisely define the demands on the crane operation. Nevertheless, it is necessary to define the real demands as precisely as possible. The only way to reach this is to determine the process that will require the biggest demands during the construction. System formworks in monolithic assembled constructions appear to be very demanding. The article shows the requirements during the mounting of system formwork by cranes. It further indicates considerable differences among time norms in planning programs. Time norms in the planning programs are compared with the time reality in certain constructions at the end of the article.

Keywords

Operation, element, system, construction, transfer.

Authors

ŠTĚRBA, M.; ČECH, D.; VENKRBEC, V.; MOTYČKA, V.

RIV year

2013

Released

10. 6. 2013

Publisher

Info Invest Ltd, Bulgaria

Location

Sunny Beach, Bulgaria

ISBN

1313-2539

Periodical

Journal of International Scientific Publications: Materials, Methods and Technologies

Year of study

7

Number

2

State

Republic of Bulgaria

Pages from

78

Pages to

84

Pages count

7

URL

BibTex

@article{BUT100141,
  author="Martin {Štěrba} and David {Čech} and Václav {Venkrbec} and Vít {Motyčka}",
  title="Formwork demands on crane operation",
  journal="Journal of International Scientific Publications: Materials, Methods and Technologies",
  year="2013",
  volume="7",
  number="2",
  pages="78--84",
  issn="1313-2539",
  url="https://www.scientific-publications.net/download/materials-methods-and-technologies-2013-2.pdf"
}