Risk Analysis of Stochastic PERT Graph

DOSKOČIL, R. DOUBRAVSKÝ, K.

Original Title

Risk Analysis of Stochastic PERT Graph

Type

journal article - other

Language

English

Original Abstract

The paper deals with a time and probability analysis of stochastic graph PERT. The paper focuses on the comparison of two different approaches calculation of probability analysis and their influence on the calculation of the planning time of the project. Concretely the planning time of the project was calculated. A sample PERT network graph was examined, which comprised 18 nodes and 18 real activities and 6 fictions activities. For the purpose of the analysis, the basic characteristic times were calculated in accordance with traditional approaches related to the PERT method. For probability analysis was also calculated expected value, variance and standard deviance of the activities. For calculation of the planning time was used distribution function of standardized normal distribution. The PERT algorithm is realized by using spreadsheet in the MS Excel.

Keywords

network graph, PERT method, node criticality, mean value, probability analysis

Authors

DOSKOČIL, R.; DOUBRAVSKÝ, K.

RIV year

2013

Released

1. 7. 2013

Publisher

Akademické nakladatelství CERM

Location

Brno

ISBN

1802-8527

Periodical

TRENDY EKONOMIKY A MANAGEMENTU

Year of study

7

Number

14

State

Czech Republic

Pages from

35

Pages to

43

Pages count

9

BibTex

@article{BUT100600,
  author="Radek {Doskočil} and Karel {Doubravský}",
  title="Risk Analysis of Stochastic PERT Graph",
  journal="TRENDY EKONOMIKY A MANAGEMENTU",
  year="2013",
  volume="7",
  number="14",
  pages="35--43",
  issn="1802-8527"
}