Přístupnostní navigace
E-application
Search Search Close
Publication detail
DOUBRAVSKÝ, K. DOSKOČIL, R.
Original Title
PERT METHOD: ANALYSIS OF NODE AND ACTIVITY CRITICALITY
Type
journal article - other
Language
English
Original Abstract
The paper deals with a time analysis of PERT network diagrams. The paper focuses on the comparison of two different approaches when analyzing node and activity criticality. A hypothesis is formed for this purpose. A sample PERT network diagram was examined, which comprised 9 nodes and 14 activities. For the purpose of the analysis, the basic characteristic times were calculated in accordance with traditional approaches related to the PERT method. Subsequently calculated probabilities were tested using hypothesis testing. It follows from the analysis that there is no statistically important difference in the results of the two approaches.
Keywords
PERT method, node criticality, activity criticality, mean value, variance, hypothesis testing
Authors
DOUBRAVSKÝ, K.; DOSKOČIL, R.
Released
1. 1. 2015
Publisher
Europen Polytechnic Institute
Location
Kunovice, Czech Republic
ISBN
2336-6141
Periodical
PROCEEDINGS: INTERNATIONAL CONFERENCE ON SOFT COMPUTING APPLIED IN COMPUTER AND ECONOMIC ENVIRONMENTS
Year of study
1
Number
State
Czech Republic
Pages from
9
Pages to
18
Pages count
10
BibTex
@article{BUT115143, author="Karel {Doubravský} and Radek {Doskočil}", title="PERT METHOD: ANALYSIS OF NODE AND ACTIVITY CRITICALITY", journal="PROCEEDINGS: INTERNATIONAL CONFERENCE ON SOFT COMPUTING APPLIED IN COMPUTER AND ECONOMIC ENVIRONMENTS", year="2015", volume="1", number="1", pages="9--18", issn="2336-6141" }