Publication detail

Scheduling of tower cranes on construction sites

MOTYČKA, V. KLEMPA, L.

Original Title

Scheduling of tower cranes on construction sites

Type

conference paper

Language

English

Original Abstract

The currently-used procedures for the proposal of cranes are based on various input indicators which only characterize the requirements for the transport of materials very roughly. The results achieved on the basis of such procedures are of varying quality, but mostly only very approximate. The capacity of the proposed cranes to supply all construction processes in the required time is not being evaluated sufficiently. The following contribution describes new, more precise ways of dealing with this task, i.e. a proposal for an evaluation procedure to determine whether proposed secondary transport using tower cranes corresponds to the transport requirements set out in the schedule for continuous construction sub-processes.

Keywords

secondary transport, scheduling, tower cran, construction sites

Authors

MOTYČKA, V.; KLEMPA, L.

Released

6. 12. 2016

Publisher

Taylor and Francis Group

Location

London

ISBN

978-1-138-03224-8

Book

Advances and Trends in Engineering Sciences and Technologies III

Pages from

567

Pages to

573

Pages count

6

BibTex

@inproceedings{BUT132554,
  author="Vít {Motyčka} and Lukáš {Klempa}",
  title="Scheduling of tower cranes on construction sites",
  booktitle="Advances and Trends in Engineering Sciences and Technologies III",
  year="2016",
  pages="567--573",
  publisher="Taylor and Francis Group",
  address="London",
  isbn="978-1-138-03224-8"
}