Přístupnostní navigace
E-application
Search Search Close
Publication detail
TEPLÝ, B., KERŠNER, Z., ROVNANÍKOVÁ, P.
Original Title
Risk analysis using Factor Method
English Title
Type
conference paper
Language
Czech
Original Abstract
According to EC regulation SEVESO II the quantification of risk has to be analysed for chemical industrial plants or infrastructure and passed on the state authorities. In certain situations the evaluation of hazard scenarios are based on the structural lifetime consideration. In such cases the Factor Method for the prediction of the lifetime may be utilized. Its probabilistic from has been formulated by considering the individual factors to be random variables and reflecting the potential damage of the structural materials due to different chemical compounds. The limit function is constructed considering the target value of structural lifetime. The relevant probability is computed by a suitable simulation technique. A case study a concrete sewage plant assessment is presented for two limiting situations.
English abstract
Key words in English
Factor method, probability, risk, sewage plant, chemical stressors
Authors
Released
1. 1. 2003
Publisher
Politecnico di Milano
Location
Milano
ISBN
88-387-2935-2
Book
Management of Durability in the Building Process
Pages from
1
Pages to
6
Pages count
BibTex
@inproceedings{BUT13285, author="Břetislav {Teplý} and Zbyněk {Keršner} and Pavla {Rovnaníková}", title="Risk analysis using Factor Method", booktitle="Management of Durability in the Building Process", year="2003", pages="6", publisher="Politecnico di Milano", address="Milano", isbn="88-387-2935-2" }