Přístupnostní navigace
E-application
Search Search Close
Publication detail
NOWÁK, J. MRŇOVÁ, Z. TICHÁ, A. TICHÝ, J. VÁZLEROVÁ, M.
Original Title
Differences in the Cost Calculation for Construction Work, RoadTransport and Water Supply
Type
conference paper
Language
English
Original Abstract
This paper presents a method of cost and price calculation of construction work, road transport and water and sewerage chargesin the Czech Republic. Costs represent animportant economic category that is closely related to theprice. Each companymust perfectly manage costing, especially absorption costing, which consists ofbudgeting overhead costs on theproduction (performance, products and services). Absorption costing is characterizedbyincludingindirect (overhead) costs together with direct costs of production into the calculation, i.e. it must absorb them completely into the costs. The absorption method is represented by thesurcharge calculation. However, creating the calculation formula for absorption costing and the procedure ofcost and price calculation have theirspecifics in various branches of theeconomy. Differences can be seen in examples of selected case studies. They deal with therepresentative cost and price calculation of construction work on a particular construction, cost and price calculation of theroad transport and one-component and two-component cost and price calculation of the water and sewerage charges. All types of calculation must reflect the economic situation of the company marketing of a new product. The diversity of the product types mentioned above indicates the need for otherinputs in the calculation and differentcalculation procedures. Without mastering absor ption costing, it is not possible to introduce more accurate calculation methods, such as the Dynamic Calculation with Contribution Margin or in the next step implement the Balanced Scorecard. Correct absorption costingcan be checked by the fact that the sum of all company production costs must correspond to the sum of the financial accounting cost accounts. However, cost control is not the subject of this article.
Keywords
Cost Calculation, Construction Work, Road Transport, Water Supply
Authors
NOWÁK, J.; MRŇOVÁ, Z.; TICHÁ, A.; TICHÝ, J.; VÁZLEROVÁ, M.
Released
18. 9. 2019
Publisher
IOP Conference Series
Location
UK
ISBN
1757-8981
Periodical
IOP Conference Series: Materials Science and Engineering
Year of study
2019
Number
603
State
United Kingdom of Great Britain and Northern Ireland
Pages from
1
Pages to
9
Pages count
BibTex
@inproceedings{BUT158698, author="Jiří {Nowak} and Zuzana {Mrňová} and Alena {Tichá} and Jan {Tichý} and Marcela {Vázlerová}", title="Differences in the Cost Calculation for Construction Work, RoadTransport and Water Supply", booktitle="4th World Multidisciplinary Civil Engineering - Architecture - Urban Planning Symposium", year="2019", journal="IOP Conference Series: Materials Science and Engineering", volume="2019", number="603", pages="1--9", publisher="IOP Conference Series", address="UK", doi="10.1088/1757-899X/603/3/032086", issn="1757-8981" }