Přístupnostní navigace
E-application
Search Search Close
Publication result detail
PAŘÍLKOVÁ, J.; PAŘÍLEK, L.; PICKA, D.; STRAČÁNEK, P.; GARDAVSKÁ, Z.; ŠAFÁŘ, R.; FEJFAROVÁ, M.
Original Title
MEASUREMENT ON A POND DAM NEAR THE MUNICIPALITY OF JEVÍČKO AND THE EARTH-FILL DIKE NEAR THE MUNICIPALITY OF KOBEŘICE
English Title
Type
Paper in proceedings (conference paper)
Original Abstract
For the needs of the Czech Anglers' Union seated in the municipality of Jevíčko, a pond has been built. Points were determined on the pond dam, where the relationship between soil moisture and the height of the water level in the pond was monitored by the indirect method of electrical impedance spectrometry. The monitoring was started on September 2008. Even after several repairs of the earth-fill dike of the Bezednik reservoir near the municipality of Kobeřice, also this hydraulic structure is monitored. The monitoring was started on June 2006. The works in both localities being realized by solving the international project E!3838 of the European programme EUREKA and proceeding further with project E!4981. Some of the results are included in the submitted paper.
English abstract
Keywords
soil, moisture, water level, pond, electrical impedance spectrometry
Key words in English
Authors
RIV year
2012
Released
09.09.2010
Publisher
VUTIUM
Location
Brno
ISBN
978-80-214-4117-0
Book
EUREKA 2010, Schedule and Proceedings
Edition
neuv
Pages from
134
Pages to
144
Pages count
11
BibTex
@inproceedings{BUT34841, author="Jana {Pařílková} and Luboš {Pařílek} and Daniel {Picka} and Pavel {Stračánek} and Zuzana {Gardavská} and Robert {Šafář} and Marie {Fejfarová}", title="MEASUREMENT ON A POND DAM NEAR THE MUNICIPALITY OF JEVÍČKO AND THE EARTH-FILL DIKE NEAR THE MUNICIPALITY OF KOBEŘICE", booktitle="EUREKA 2010, Schedule and Proceedings", year="2010", series="neuv", number="1", pages="134--144", publisher="VUTIUM", address="Brno", isbn="978-80-214-4117-0" }