Přístupnostní navigace
E-application
Search Search Close
Publication detail
STRÁSKÝ, J.
Original Title
Lávka pro pěší přes řeku Medway v Maidstone, UK
English Title
Pedestrian bridge over the Medway river in Maidstone, UK
Type
conference paper
Language
Czech
Original Abstract
Pedestrian bridge across river Medway, Maidstone, UK. Stress ribbon structure of a total length of 101 m with two spans of 49,5 m and 37,5 m. First stress ribbon bridge with unique crankded alignment in the world. Composite concrete deck is formed of pre-cast segments and in situ concrete fill. The superstructure is post tensioned by unbonded tendons with double anti-corrosion protecstion. Intermediate support transfers the horizontal force from the alignment bent and also serves as stairs to access the deck.
English abstract
Key words in English
pedestrian bridge, segments, stress ribbon, statical and dynamical analysis, methoůd of erection
Authors
RIV year
2001
Released
1. 4. 2001
Publisher
Akademické nakladaatelství CERM, s.r.o. Brno
Location
Akademické nakladatelství CERM, s.r.o., Brno
ISBN
80-7204-195-9
Book
6. mezinárodní sympozium Mosty 2001 - sborník příspěvků
Edition number
1
Pages from
16-20
Pages count
5