Přístupnostní navigace
E-application
Search Search Close
Publication detail
ŠTĚPÁNEK, P., SEČKÁŘ, M., ŠVAŘÍČEK, L., ZMEK, B., HOBST, L.
Original Title
Sanitation of a panel building
Type
conference paper
Language
English
Original Abstract
12-floors panel building was disrupted due to non-uniform settlement. One half of the building was founded on the parent rock, the second one on a layer of sand and loess of thickness c. 6,0 m. The building is a precast panel structure with cast-in-place basement (cast-in-place box structure with panel ceiling) and combined load-bearing system. Non-uniform settlement caused failure of the load-bearing structure (load-bearing panels, joints) and partition walls. Detail investigation and measurement proved the non-uniform settlement about 100 mm. Carried out repairs: foundation sanitation (grid of micro-piles, injection of cracks of the cast-in-place basement and load-bearing wall panels), recovery of the function of statically unstable joints (additional external non-prestressed reinforcement), recovery of the spatial stiffness using external prestressed reinforcement (monostrands Lp 15,5 mm). In regard of faults of the sandwich cladding (these faults was caused by the settlement too), its repair was realised using additional anchorage of the external cover concrete plate to the concrete load-bearing part.
Key words in English
sanitation, panel building, precast, concrete
Authors
RIV year
2002
Released
1. 1. 2002
Location
Rio de Janeiro
Pages from
490
Pages to
497
Pages count
8
BibTex
@inproceedings{BUT9989, author="Petr {Štěpánek} and Milan {Sečkář} and Libor {Švaříček} and Bohuslav {Zmek} and Leonard {Hobst}", title="Sanitation of a panel building", booktitle="Proceedings of the 3rd international conference DAMSTRUC 2002", year="2002", pages="8", address="Rio de Janeiro" }