Přístupnostní navigace
E-application
Search Search Close
Publication detail
DUCHAN, D. DRÁB, A. NEUMAYER, O.
Original Title
Small Hydropower Plants in the Czech Republic
Type
book chapter
Language
English
Original Abstract
This chapter aims to present selected small hydropower plants realized in the Czech Republic for about 16 years, which are interesting both from a technical point of view and from the point of view of the architectural design. To improve the economic efficiency of the investment, most of the newly built hydroelectric power plants were implemented using existing weirs or dams. Besides the new buildings, a number of general reconstructions of the technological and construction part of the small hydropower plants were also carried out, aiming to increase the efficiency of these sources. In the end, the foreseen future development in the field of power plants in the Czech Republic is indicated.
Keywords
Small hydropower plant, Design, Weir, Dam, Reconstruction, Kaplan turbine
Authors
DUCHAN, D.; DRÁB, A.; NEUMAYER, O.
Released
1. 8. 2019
Publisher
Springer Nature Switzerland AG
Location
Switzerland
ISBN
978-3-030-18358-5
Book
Management of Water Quality and Quantity
Edition
SPWA
Pages from
365
Pages to
395
Pages count
30
URL
https://link.springer.com/chapter/10.1007/978-3-030-18359-2_15
BibTex
@inbook{BUT157919, author="David {Duchan} and Aleš {Dráb} and Oldřich {Neumayer}", title="Small Hydropower Plants in the Czech Republic", booktitle="Management of Water Quality and Quantity", year="2019", publisher="Springer Nature Switzerland AG", address="Switzerland", series="SPWA", pages="365--395", doi="10.1007/978-3-030-18359-2\{_}15", isbn="978-3-030-18358-5", url="https://link.springer.com/chapter/10.1007/978-3-030-18359-2_15" }