Publication detail

Care of the greenhouse bearing system at the Lednice chateau

BAJER, M. KALA, J.

Original Title

Care of the greenhouse bearing system at the Lednice chateau

Type

journal article - other

Language

English

Original Abstract

The priority of the monumet care of the bearing steel structure in the greenhouse at the Lednice chateau was to protect the greenhouse vegetation. First - between the years 1995 and 1997 - came the analysis of the actual condicion of the monument and conservators prospecting report. The preparation of the design documentation and conservators project followed. In the second stage (from 1997 to 2003) the monument care project was realized. The recovery of the greenhouse healting system was carried out in 1997 and in 1998, the structure of the greenhouse and its interior was reconstructed between 1999 and 2001. In 2002 and 2003 the exterior reconstruction was finished. The final task consists in reconstructing the catacombs, the burial palce under the greenhouse. The aim of this article is to approach the reconstruction method of the load carrying decorative column. The restoration of the Lednice greenhouse was awarded by GRAND PRIX 2003 prize of architectural associations.

Keywords

Monument care, Lednice Chateau, GRAND PRIX 2003, Greenhouse bearing system

Authors

BAJER, M.; KALA, J.

Released

15. 11. 2003

Publisher

Fakulty of Civil Engineering, Slovak University of Technology

Location

Bratislava, Slovenská Republika, 2003

ISBN

1210-3896

Periodical

Slovak Journal of Civil Emgineering

Year of study

XI

Number

4

State

Slovak Republic

Pages from

16

Pages to

20

Pages count

5

BibTex

@article{BUT43008,
  author="Miroslav {Bajer} and Jiří {Kala}",
  title="Care of the greenhouse bearing system at the Lednice chateau",
  journal="Slovak Journal of Civil Emgineering",
  year="2003",
  volume="XI",
  number="4",
  pages="16--20",
  issn="1210-3896"
}