Course detail

Public Structural Investment II

FAST-CV70Acad. year: 2011/2012

The public tenders – public procurement, definition of evaluation criterion and their weights, (points method, value analysis…), choosing of contractor and conclusion of contract. Technical, preliminary and implementation documentation of projects financed from public sources. Technically–economic study, socially-economic analysis, sensitivity analysis a risk analysis. Public private partnership, documentation, specific risk analysis.

Language of instruction

Czech

Number of ECTS credits

8

Mode of study

Not applicable.

Department

Institute of Structural Economics and Management (EKR)

Learning outcomes of the course unit

Knowledge of creation of public structure project. Case study for Public tender.

Prerequisites

Knowledge within the scope of Public structural investment I

Co-requisites

Not applicable.

Planned learning activities and teaching methods

Not applicable.

Assesment methods and criteria linked to learning outcomes

Requirements for successful completion of the subject are specified by guarantor’s regulation updated for every academic year.

Course curriculum

1. Public projects, characteristics
2. Feasibility study of public structural projects
3. Cost benefit analysis of public structural projects. Life cycle costs of public structural projects
4. Sensitivity and probability analysis of outputs. Risk analysis of public structural projects
5. Public contracts, terms, award procedures – Act No 137/2006 Coll., on Public Contracts
6. Public contracts, general qualification criteria, contract documentation of structure
7. Public contract criteria for selection of optimal tender, value analysis usage (methods)
8. Above the threshold public contract
9. Public Private Partnership (PPP), Act No 139/2006 Coll., on Concession Contracts and Concession Procedures (Concessions Act)
10. PPP projects documentation. PPP risk analysis

Work placements

Not applicable.

Aims

Advanced knowledge about problems regarding to award, evaluation and realize of public contracts, elaboration of projects for public financial resources. Public Private Partnership.

Specification of controlled education, way of implementation and compensation for absences

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Recommended optional programme components

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Guide to Cost-Benefit Analysis of Major Projects in context of EC regional Policy. UNIDO, 1997. (CS)
Guide to Cost-Benefit Analysis of Major Projects in context of EC regional Policy. UNIDO, 1997. (EN)
Musgrave, Richard, Abel and Musgrave, Peggy, Brewer: Veřejné finance v teorii a praxi. Management Press, Praha, 1994. 80-85603-76-4. (CS)
Ochrana, František: Veřejný sektor a efektivní rozhodování. Praha: Management Press, 2001. 80-7261-018-X. (CS)
Zákon č. 137/2006, o veřejných zakázkách v platném znění. Praha, 2006. (CS)

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme N-P-E-SI Master's

    branch E , 2 year of study, winter semester, elective

  • Programme N-P-C-SI Master's

    branch E , 2 year of study, winter semester, elective

  • Programme N-K-C-SI Master's

    branch E , 2 year of study, winter semester, elective

Type of course unit

 

Lecture

26 hod., optionally

Teacher / Lecturer

Exercise

26 hod., compulsory

Teacher / Lecturer