Computer support in construction preparation and realization I
FAST-CW14Acad. year: 2012/2013
Modelling of the construction process depending on the building parameters and applied software. The ASPE system for planning and management of transport and building constructions. Relation to the URS price lists in the branch of building constructions and transport infrastructure constructions. Investor and supplier contract controlling.
Instruction for CONTEC software application and application of building-technology network charts. Modification and creation of type network charts of the program from building structures, utilities and roads areas. Quality management and possibility of automated generation of control and inspection plans. Creation of environmental plans for environmental protection. Setting of parameters for the site plant plan.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
2. Classification of production and data basis of ASPE and ÚRS system. Branch classification of building structures and jobs of road and railways constructions.
3. Budget estimates and creation of calculated quotation in the ASPE system.
4. Time schedule. Monitoring of the execution by contractor´s manager. Creation of the job list. Expenditures controlling.
5. Computer aid and modelling of construction preparation and realization in CONTEC system by means of building-technological network chart. Data links and date take over from the bills of quantities, budgets and production calculations into the building-technological designs in CONTEC system.
7. Activities in network charts. Links between activities and building readiness. Time, resource and capacity planning. Cost planning. Operative records keeping. Time schedule up-dating. Outputs – diagrams of resource demands as a basis for the site plant plan.
8. Computer aid of the links – control and inspection plan for the technology analysis and time schedule, environmental plan for other documents of the building-technological design.
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Benč,F.: Nákladový controlling v programu ASPE. Stavitel č.1, 2005.
Benč,F.: Návod pro tvorbu soupisu prací a zjišťovacích protokolů v systému ASPE. ASPE Praha, 2005.
firemní SW: Návody pro SW: CONTEC, MS-Project, RTS-BuildPower, RSV, KROS Plus. 0.
Jarský, Č., Musil, F., Svoboda ,P., Gašparík, J., Motyčka, V., Pospíchal, V. Kovářová, B., Vyčítal, M. Příprava a realizace staveb. Cerm s.r.o. Brno, 2019. (CS)
Recommended reading
Hrazdil,V.,Rada,V.: Inspekce a dozor při stavbě, Studijní opora. FAST, VUT v Brně, 2006.
Jarský,Č. a kol.: Příprava a realizace staveb - multimediální učebnice. FSv ČVUT V Praze, 2005.
Classification of course in study plans
Type of course unit
Lecture
Teacher / Lecturer
Syllabus
2. Classification of production and data basis of ASPE and ÚRS system. Branch classification of building structures and jobs of road and railways constructions.
3. Budget estimates and creation of calculated quotation in the ASPE system.
4. Time schedule. Monitoring of the execution by contractor´s manager. Creation of the job list. Expenditures controlling.
5. Computer aid and modelling of construction preparation and realization in CONTEC system by means of building-technological network chart. Data links and date take over from the bills of quantities, budgets and production calculations into the building-technological designs in CONTEC system.
7. Activities in network charts. Links between activities and building readiness. Time, resource and capacity planning. Cost planning. Operative records keeping. Time schedule up-dating. Outputs – diagrams of resource demands as a basis for the site plant plan.
8. Computer aid of the links – control and inspection plan for the technology analysis and time schedule, environmental plan for other documents of the building-technological design.
Exercise
Teacher / Lecturer
Syllabus
2. Introduction to budgets and work with BUILDpower software: starting an order, starting a contract, setting up a building facility, budget, budgetary process, different types of items, work schedule.
3. Introduction to time management and work with CONTEC software tool: project set up, creation of time plan with gradual modelling with the use of standardized network graphs, relations, optimization according to the availability of resources. Individual work – modelling of the chosen construction to an extent of 20 items focusing on branching of the network graph.
4. Individual works – compilation of itemized budget of the model construction in the range of 20 items focused on the use of different sections, conversion to CONTEC, creation of a construction technological model on the basis of the converted data.
5. Conversion of budget created during seminar 4 from the BUILDpower into Microsoft Project, conversion of the time schedule seen in seminar 4 from CONTEC into Microsoft Project.
6. Microsoft project program – setting before use, object modelling, data conversion DURATION/WORK/UNITS, bond input, source input, limitations
7. Creation of technological standards and time schedule in the Microsoft Project environment with the use of makra and programming of chart (table)