Transfer of the contract calculation by means of a „technology model“ into the environment of the network planning program. Operative production and management. Continuous assessment of expenditures and resources. References to the links to the files for quality assurance, environmental management and occupational safety management in the information system of the executing company. MS-Project application based on the spreadsheets of assignment and summary output reports. Application of calculation data files in RTS-Build Power, or program system for planning and management of the building constructions. Planning and management of the building operations in building operations management (RSV) system in the link to KROS Plus and MS-Project. Practical demonstrations of RSV system application in the area of transport constructions.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Recommended reading
Classification of course in study plans
branch R , 2 year of study, winter semester, compulsory
Lecture
Teacher / Lecturer
Syllabus
Exercise