Přístupnostní navigace
E-application
Search Search Close
Course detail
FAST-BR053Acad. year: 2019/2020
Hydro power plants – definition, terminology, division, legislative conditions required for realization and innovation of hydro power plants , types of plants considering its placement (structure and technology). Newly built hydro power plants , reconstruction of existing hydro power plants.Turbines for hydro power plants – types, products information.Economic conditions for the hydro power plants construction and operation, capital cost repayment period.Study, conceptual solution of hydro power plants constructional components. Hydrotechnical and hydroenergetical calculations.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Recommended reading
Classification of course in study plans
branch V , 4 year of study, summer semester, elective
Lecture
Teacher / Lecturer
Syllabus
Exercise