Přístupnostní navigace
E-application
Search Search Close
Course detail
FAST-BS053Acad. year: 2019/2020
Introduction, definitions, history of the pond construction in CRCategorization and function, research, selection of locality for small water reservoirWater management of small water reservoirs, water losses, physical, chemical and biological processesPond dams, outlets, extractions, safety spillways, pond bottom, littoral zone, reservoir surroundingFish breeding ponds, water supply, industrial and irrigation reservoirs,Polders, Erosion control reservoirs, rain water reservoirs, etc.Operation and service regulations, mud removal, reservoirs restorationReconstruction and updating of small water reservoirs, faults of the pond dams, mistakes in ponds designing, course of construction.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Recommended reading
Classification of course in study plans
branch V , 4 year of study, summer semester, elective
Lecture
Teacher / Lecturer
Syllabus
Exercise