Course detail

Sewerage Systems - town drainage

FAST-DP62Acad. year: 2020/2021

The subject deals in detail with drainage of urbanized areas considering the hydrologic, hydraulic and other aspects – especially the structural and technological problems of sewerage system constructions. Materials of sewerage systems. Sewerage systems reliability and control. Basic standards for design, modelling and control of urbanized area drainage. This subject is globally focused on water management (design, construction, legislation, engineering work).

Language of instruction

Czech

Number of ECTS credits

8

Mode of study

Not applicable.

Department

Institute of Municipal Water Management (VHO)

Learning outcomes of the course unit

Student will manage aim of course: planning, design, operating and rehabilitation of sewer networks including hydroinformatics.

Prerequisites

Hydraulics, Hydrology, Engineering nets, Chemistry and Water Technology, Sewerage

Co-requisites

Not applicable.

Planned learning activities and teaching methods

Not applicable.

Assesment methods and criteria linked to learning outcomes

Not applicable.

Course curriculum

1) Introduction to the problems and meet with the topics and basic concepts
2) Sorts of sewerage systems and their schematics
3) Assesment of design discharge of sewerages
4) Assesment of design discharge of rainy sewerage water and processing udometric data
5) Hydraulics - summary axiom for non-pressure streaming
6) Pipe materials of sewerage networks and objects on sewerage networks
7) Sewer connections, overfow and rainy basin
8) Verification of watertightness on sewerage networks
9) Servicing and maintenance of sewerage networks
10) Non-traditional means of sewers (pressure, vacual and small-profile sewerage)
11) Build-up of sewerage networks
12) Reconstruction of sewerage networks
13) Information about examinations, reserve, exercise in examine problems

Work placements

Not applicable.

Aims

The subject bears informations on sewerage net and about drainage of urbanized areas. Object introduce with procedure design of sewerage systems and with related legislative and with problems at build-up sewerage systems. Next subject bears with detailed processing of calculation for proposal dimensions of sewerage systems.

Specification of controlled education, way of implementation and compensation for absences

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Recommended optional programme components

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Not applicable.

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme D-P-E-CE (N) Doctoral

    branch VHS , 2 year of study, winter semester, compulsory-optional

  • Programme D-P-C-SI (N) Doctoral

    branch VHS , 2 year of study, winter semester, compulsory-optional

  • Programme D-K-E-CE (N) Doctoral

    branch VHS , 2 year of study, winter semester, compulsory-optional

  • Programme D-K-C-SI (N) Doctoral

    branch VHS , 2 year of study, winter semester, compulsory-optional

Type of course unit

 

Lecture

39 hod., optionally

Teacher / Lecturer

Syllabus

1) Introduction to the problems and meet with the topics and basic concepts 2) Sorts of sewerage systems and their schematics 3) Assesment of design discharge of sewerages 4) Assesment of design discharge of rainy sewerage water and processing udometric data 5) Hydraulics - summary axiom for non-pressure streaming 6) Pipe materials of sewerage networks and objects on sewerage networks 7) Sewer connections, overfow and rainy basin 8) Verification of watertightness on sewerage networks 9) Servicing and maintenance of sewerage networks 10) Non-traditional means of sewers (pressure, vacual and small-profile sewerage) 11) Build-up of sewerage networks 12) Reconstruction of sewerage networks 13) Information about examinations, reserve, exercise in examine problems