Course detail

Construction Preparation and Realization

FAST-BWA013Acad. year: 2020/2021

The subject deals with preparation and manner of construction of buildings and building complexes. It is a complex process involving investment intention, its technical preparation, economic calculations, building permit procedure, building technology preparation and the resulting phase – the construction realisation. The subject dealing with a structure and coordination of preparation, partial and stage building processes into a complete and sophisticated system the result of which is a completed construction building or their assembly, i.e. construction.

Language of instruction

Czech

Number of ECTS credits

4

Mode of study

Not applicable.

Department

Institute of Technology, Mechanisation and Construction Management (TST)

Learning outcomes of the course unit

Not applicable.

Prerequisites

Basic knowledge of parties and processes of the construction.

Co-requisites

Not applicable.

Planned learning activities and teaching methods

Not applicable.

Assesment methods and criteria linked to learning outcomes

Not applicable.

Course curriculum

1. Introduction into the subject – investment policy, investment process and parties to the construction.
2. Public hearing – proceedings on the building location, selected activities in construction.
3. Tender process, ways of contracting public tenders.
4. Modelling of construction production area, principles of construction plants planning.
5. Supplier systems in construction, jobs in the production process, acceptance procedure.
6. Site construction processes (construction division, production processes, space structure).
7. Modelling of the construction time structure (construction period, time schedule, cyclograph).
8. Methods of network planning (edge network graph, junction network graph), network analysis.
9. Price calculation (price of building works, calculation formula, value added tax).
10. Operation control on constructions, production quality, environment protection).
11. Safety and health protection at work, principals of safe execution of works.

Work placements

Not applicable.

Aims

Not applicable.

Specification of controlled education, way of implementation and compensation for absences

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Recommended optional programme components

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Not applicable.

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme BPC-EVB Bachelor's 4 year of study, summer semester, compulsory

Type of course unit

 

Lecture

26 hod., optionally

Teacher / Lecturer

Syllabus

1. Introduction into the subject – investment policy, investment process and parties to the construction. 2. Public hearing – proceedings on the building location, selected activities in construction. 3. Tender process, ways of contracting public tenders. 4. Modelling of construction production area, principles of construction plants planning. 5. Supplier systems in construction, jobs in the production process, acceptance procedure. 6. Site construction processes (construction division, production processes, space structure). 7. Modelling of the construction time structure (construction period, time schedule, cyclograph). 8. Methods of network planning (edge network graph, junction network graph), network analysis. 9. Price calculation (price of building works, calculation formula, value added tax). 10. Operation control on constructions, production quality, environment protection). 11. Safety and health protection at work, principals of safe execution of works.

Exercise

26 hod., compulsory

Teacher / Lecturer

Syllabus

1. Introduction to the course, semestral course syllabus, organization instructions. 2.–3. Completion of the data accompanying report, summary report, construction situation and principles of the construction organization according to the regulations about the construction documentation no.62/2013 legal code as amended by decree no. 405/2017 legal code 4. Sample forms according to regulation 526/2006 legal code (as amended) and their filling (2 forms). 5. Transfer protocol between the ordering party and the constructor (construction site handover, the building handover), filling out the report and drawing up the list of documents for the handover process of the individual project. 6. Announcement of the competitive tendering, request conditions, offer processing, offers evaluation. 7.–8. Bar chart, cyclograph. 9.–10. Edge and node defined network diagram. 11. Credit.