Přístupnostní navigace
E-application
Search Search Close
Course detail
FCH-MC_COVAcad. year: 2021/2022
The course provides theoretical knowledge and practical skills to design facilities in waste water treatment plant (WWTP). The complex project of the municipal WWTP is solved in 3-4 member team and it is focused on theoretical, computational, and engineering designs of each facility: pumping stations, waste water (WW) pretreatment, biological treatment, and sludge management. In this case, the course is also focused on innovative technologies material transformation of sewage sludge, membrane technologies, technologies for reuse of treated WW and the technology to remove organic pollutants from WW. The course provides an experience of teamwork of the complex design of WWTP.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Learning outcomes of the course unit
Prerequisites
Co-requisites
Planned learning activities and teaching methods
Assesment methods and criteria linked to learning outcomes
Course curriculum
Work placements
Aims
Specification of controlled education, way of implementation and compensation for absences
Recommended optional programme components
Prerequisites and corequisites
Basic literature
Recommended reading
Classification of course in study plans
specialization --- , 2 year of study, winter semester, compulsory-optional
Guided consultation in combined form of studies
Teacher / Lecturer
Exercise
Lecture