Course detail

Wastewater Collection and Wastewater Treatment

FAST-BPA006Acad. year: 2021/2022

Subject deals with drainage of urban areas with relation to hydrological, hydraulic and another aspect - - in particular structural-technological problems in designing of sewerage networks. Materials used for sewerage networks. It is related to reliability and control of sewerage networks. Basic normative details of design, expert opinion and operation of drainage in urbanized areas. Preparation for graduate students is directed to work in wide range of knowledge (prepare students for design activities, construction, legislation problems and engineering activities) in the water management.

Language of instruction

Czech

Number of ECTS credits

5

Mode of study

Not applicable.

Department

Institute of Municipal Water Management (VHO)

Learning outcomes of the course unit

Student will manage wastewater collection from urban area, basics of design and operation of sewerage networks, technological and hydraulic design of WWTP, technology of wastewater treatment and sludge treatment, upgrading of WWTP and operation of WWTP.

Prerequisites

Chemistry and water technology, hydraulics, hydrology, design of civil constructions

Co-requisites

Not applicable.

Planned learning activities and teaching methods

Not applicable.

Assesment methods and criteria linked to learning outcomes

Not applicable.

Course curriculum

1. Development of wastewater collection, urban drainage, basic notions, legislation.
2. Wastewater collection schemes and drainage systems. Innovative means of drainage.
3. Storm and storm data. Storm outflow from urbanized area.
4. Hydraulic of sewerage systems., combined sewer overflows, master plans.
5. Sewerage networks and connections. Storm water harvesting.
6. Objects on sewerage systems. Strategy of surface water protection.
7. Excursion of WWTP Modrice.
8. Development, history, dimensioning of WWTP and small WWTP. Mechanical and chemical treatment of wastewater.
9. Biological treatment of wastewater, activated sludge process.
10. Modern method of nitrogen and phosphorus removal.
11. Aeration and separation of activated sludge. Systems with attached biomass.
12. Sludge treatment at WWTP, final sludge disposal.
13. Anaerobic wastewater treatment.

Work placements

Not applicable.

Aims

wastewater collection from urban area, basics of design and operation of sewerage networks, technological and hydraulic design of WWTP, technology of wastewater treatment and sludge treatment, upgrading of WWTP, operation of WWTP.

Specification of controlled education, way of implementation and compensation for absences

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Recommended optional programme components

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Not applicable.

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme BPC-SI Bachelor's

    specialization V , 4 year of study, winter semester, compulsory

Type of course unit

 

Lecture

26 hod., optionally

Teacher / Lecturer

Syllabus

1. Development of wastewater collection, urban drainage, basic notions, legislation. 2. Wastewater collection schemes and drainage systems. Innovative means of drainage. 3. Storm and storm data. Storm outflow from urbanized area. 4. Hydraulic of sewerage systems., combined sewer overflows, master plans. 5. Sewerage networks and connections. Storm water harvesting. 6. Objects on sewerage systems. Strategy of surface water protection. 7. Excursion of WWTP Modrice. 8. Development, history, dimensioning of WWTP and small WWTP. Mechanical and chemical treatment of wastewater. 9. Biological treatment of wastewater, activated sludge process. 10. Modern method of nitrogen and phosphorus removal. 11. Aeration and separation of activated sludge. Systems with attached biomass. 12. Sludge treatment at WWTP, final sludge disposal. 13. Anaerobic wastewater treatment.

Exercise

26 hod., compulsory

Teacher / Lecturer

Syllabus

Sewerage: 1. Hydraulic calculation of flow in circular profile. 2. Dimenzioning of sewerage networks. 3. Design of line of sewerage network, hydrotechnic situation, calculation of sewage from urbanized area. 4. Desing of dimensions of sewerage network by rational method. 5. Longitudinal profile of sewer. Wastewater treatment: 6. Flow at WWTP, basic scheme of WWTP. 7. Mechanical pretreatment – screens. 8. Mechanical pretreatment – sand trap. 9. Mechanical treatment – settling tank. 10. Biological treatment – activated sludge tank. 11. Biological treatment – final clarifier. 12. Sludge treatment – sludge production. 13. Credit.