Course detail

Project Sewerages and WWTP

FAST-BP007Acad. year: 2022/2023

The aim of the subject is to extend and practise theoretical knowledge and practical design proficiency that is obtained earlier in subjects “Sewerage” and “Wastewater treatment”. In the frame of the comprehensive project is solved urban runoff drainage and safe treatment of all types of wastewater in the real catchment area. Students propose a project documentation of sewerage network and wastewater treatment plant. Drawing documentation includes technical report and detailed hydrotechnic and technologic calculations. Students use computers and current software.

Language of instruction

Czech

Number of ECTS credits

3

Mode of study

Not applicable.

Department

Institute of Municipal Water Management (VHO)

Learning outcomes of the course unit

Not applicable.

Prerequisites

Hydraulics, Hydrology, Engineering nets, Sewerage Systems, Chemistry and Water Technology, Treatment of waste water

Co-requisites

Not applicable.

Planned learning activities and teaching methods

Not applicable.

Assesment methods and criteria linked to learning outcomes

Not applicable.

Course curriculum

Not applicable.

Work placements

Not applicable.

Aims

The basic conception solution and design of drainage urban areas and treatment of waste-water from urban areas.

Specification of controlled education, way of implementation and compensation for absences

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Recommended optional programme components

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Not applicable.

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme B-P-C-SI Bachelor's

    branch V , 4 year of study, summer semester, compulsory

  • Programme B-K-C-SI Bachelor's

    branch V , 4 year of study, summer semester, compulsory

  • Programme B-P-E-SI Bachelor's

    branch V , 4 year of study, summer semester, compulsory

Type of course unit

 

Project

26 hod., compulsory

Teacher / Lecturer

Syllabus

1. Project assignment, drawing of work teams 2. Design of the concept of sewerage and wastewater disposal, description of the location and equipment of the family house, location of the house, accompanying report, situation of wider relations, characteristic flows in sewerage connections 3. Technical parameters of sewer connections, dimension design, accompanying report, sample cross-sections of sewerage connections, summary technical report 4. Fabric loading of WWTPs, summary technical report, sample drawing of sewerage shaft 5. Design of volumes of WWTP facilities, design of domestic WWTP, cadastral situation drawing, longitudinal profile of sewer connections, summary technical report 6. Balance of discharged pollution, floor plan and section of domestic WWTP, summary technical report 7. Technological scheme of WWTP, mixing equations, summary technical report 8. Coordination drawing, summary technical report 9. Outlet object (connection to sewerage, infiltration object), attachments for the document part 10. Completion of the project, filling in applications 11. Project defense, credit