Course detail

Specialized Project (S-PST)

FAST-CH006Acad. year: 2023/2024

In this course the student shows the ability to to draw up construction and technical design documentation of the building, which is intended as the basis for the project execution stage. The text section describes the the construction site and technical solution bearing structures and supplementary works to determine energy intensity of buildings and fire safety too. Graphical part is processed pursuant to Act No. 183/2006 Coll. and its implementing regulations 499/2006 Sb. on construction documentation.

Language of instruction

Czech

Number of ECTS credits

8

Mode of study

Not applicable.

Department

Institute of Building Structures (PST)

Entry knowledge

An understanding of the content from the bachelor’s study programme “Building engineering” and furthermore from the 2nd and 3rd semester of the master study programme.

Rules for evaluation and completion of the course

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Aims

Students will improve their knowledge during the semester and will be exposed to drawing up a building design for realization.
Student copes aim subject that the is establishment that the has
needed theoretic knowledge from mentioned pass articles to creation
conceptual proposal solving engineering construction for functional
project documentation building parts

Study aids

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Not applicable.

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme N-P-C-SI Master's

    branch S , 2 year of study, winter semester, compulsory

  • Programme N-K-C-SI Master's

    branch S , 2 year of study, winter semester, compulsory

Type of course unit

 

Project

26 hod., compulsory

Teacher / Lecturer

Syllabus

1.-3. Proposal disposition of the building, M 1:200, the choice of structural system, modular co-ordination 4.-5. Floor plans, M 1:100 6. 1st floor in scale 1:50 7. The cuts, M 1:100 8. The roof structure, M 1:100 9. Details 10. Views, 1:100 12. Technical report 13. The situation, M 1:200