Course detail

Prices in Civil Engineering 2

FAST-CV021Acad. year: 2023/2024

Pricing in construction production. Costing for setting of construction works prices and constructions.Costs and calculation. Calculation techniques and methods.
Costing of construction works, methods. Calculation of overhead and profit.Software support of costing and calculations.

Language of instruction

Czech

Number of ECTS credits

4

Mode of study

Not applicable.

Department

Institute of Structural Economics and Management (EKR)

Entry knowledge

Design and technology of construction and works. classification in construction , construction enterprise economy , cost estimating and prices of construction.

Rules for evaluation and completion of the course

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Aims

The ability to calculate the prices of construction works with respect to consistency with the information construction enterprise economic system and to the market. Budgeting skills of the works of the company calculated costs and prices. Ability to analyze prices and costs for the contract.
Special knowledge and skills in costing, with special focus on costing in construction. Processing itemized cost estimating of the building , including a detailed bill of quantities. Valuation by catalog and with calculated prices. Cost and price analysis .

Study aids

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Not applicable.

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme N-P-C-SI Master's

    branch N , 1 year of study, winter semester, compulsory

  • Programme N-K-C-SI Master's

    branch N , 1 year of study, winter semester, compulsory

Type of course unit

 

Lecture

13 hod., optionally

Teacher / Lecturer

Syllabus

1. Prices and costs in the building life cycle. Construction classification. 2.Methods of pricing. Software for cost estimating. 3.Cost estimating in construction. Technical and valuation documentation. 4.Detaile itemize cost estimating of construction. Rules.Sorting of building works. 5.Compilation of bill of quantities. Methods of measurement of building and construction work. Specifics. 6. Valuation of bill of quantities by catalog prices. Compilation of itemize cost estimating. 7.Costs.Classification of costs.Calculation in the economic system of the company. 8.Calculation techniques.Přirážková calculation. 9.Calculation methods. Absorption costing. Non-absorbent calculation. 10.Calculation of list price of work. Analysis of calculation. 11.Calculation of firm prices of work. Calculation bases. 12.Calculation of firm price of work. Calculating of costs, profit and risk. 13.Price and cost analysis of contract. Price and cost management.

Exercise

26 hod., compulsory

Teacher / Lecturer

Syllabus

1. Detailed cost estimating of the building 2. Detailed cost estimating of the building 3. Detailed cost estimating of the building 4. Detailed cost estimating of the building 5. Detailed cost estimating of the building 6. Detailed cost estimating of the building 7. Price and cost analysis 8. Price and cost Analysis 9. Price and cost Analysis 10. Price and cost analysis 11. Evaluation 12. Completion 13. Completion