Course detail

Selected Chapters of Plumbing

FAST-CT003Acad. year: 2023/2024

Theoretical fundamentals of pumping process within hydraulic systems. Pump application within plumbing engineering specialization – overview of systems applied for water supply and drainage for buildings. Design of pump stations and conjoint equipment.
Basic information about sprinkler fixed extinguishing systems.
Acquaintances extension of rainwater soakaways and retention tanks, rainwater harvesting and central domestic hot water heating systems. Overview of appliances for potable water conditioning before heating. Problems of domestic hot water temperature control.

Language of instruction

Czech

Number of ECTS credits

5

Mode of study

Not applicable.

Department

Institute of Building Services (TZB)

Entry knowledge

Fundamentals of hydraulics - water flow in a closed pressurized systems and gravity flow systems, basic principles of plumbing, basic knowledge of hot water supply systems.

Rules for evaluation and completion of the course

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Aims

To extend basic information of plumbing engineering especially in the area of water pumping, extinguishing systems and water heating systems. Design pumping stations within plumbing engineering specialization, to do conjoint hydraulic calculations and to process necessary drawings, further the students will be able to design domestic hot water systems efficiently including thermal calculations. Sprinkler fixed extinguishing systems.
Student upgrade his qualifications in plumbing systems in buildings.

Study aids

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Jánošková, T. - Peráčková, J.: Zdravotná technika. JAGA GROUP Bratislava 2022. (SK)
Valášek, J. a kol.: Zdravotnětechnická zařízení budov. JAGA group, Bratislava 2006. (CS)
Vališ, I.- Vrána, J.: Příručka s praktickými radami pro zřizovatele domovních plynovodů a spotřebičů plynných paliv. GAS, Praha 2013. (CS)
Vavřička, R. a kol.: Příprava teplé vody. Sešit projektanta 3 – pracovní podklady. STP Praha 2017. (CS)
Žabička, Z. - Vrána, K.: TP 1.20 Hospodaření se srážkovou vodou v nemovitostech. ČKAIT Praha 2011. (CS)
Žabička, Z.- Vrána, J.: Zdravotně technické instalace. ERA group, Brno 2009. (CS)

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme N-P-C-SI Master's

    branch S , 1 year of study, summer semester, compulsory

  • Programme N-K-C-SI Master's

    branch S , 1 year of study, summer semester, compulsory

Type of course unit

 

Lecture

26 hod., optionally

Teacher / Lecturer

Syllabus

1. Potable water demand and quantity of wastewater, introduction to pumps systems, suction head for pumps 2. Pump head-capacity curves 3. System head curves, point of pumps operation 4. Change of point of pump operation 5. Pumps and pumps stations for plumbing engineering 6. Booster pump systems and hydropneumatic tank systems for water supply 7. Determination of capacity of gravity tanks (suction, storage) and pressure tanks (diaphragm tanks) 8. Automatic wastewater lifting plants and their design 9. Sprinkler fixed extinguishing systems – purpose, application, fundamental arrangement and sprinkler installations 10. Management of rainwater, soakaways, retention tanks, rainwater harvesting 11. Central water heating – storage and instantaneous systems 12. Central water heating - design of systems components 13. Potable water conditioning before heating, control of domestic hot water temperature

Exercise

26 hod., compulsory

Teacher / Lecturer

Syllabus

1. Fundamental calculations for plumbing systems. 2. Pumps and pumps systems – piping and pumps design. 3. Pump head-capacity curves. System head curves. 4. Point of pump system operation. Available suction head for pumps. 5. Water supply for building – variants. 6. Axonometric scheme of chosen variant. Water system sizing. 7. Pump station sizing for building water supply. 8. Determination of capacity of tanks. 9. Sprinkler heads arrangement. 10. Rainwater soakaway design, rainwater harvesting design. 11. Division of domestic hot water demand in building. 12. Storage heater sizing. Safety device sizing. 13. Final calculations check. Credit.