Course detail

Project Sewerages and WWTP

FAST-BPA011Acad. year: 2023/2024

The aim of the subject is to extend and practise theoretical knowledge and practical design proficiency that is obtained earlier in subjects “Sewerage” and “Wastewater treatment”. In the frame of the comprehensive project is solved urban runoff drainage and safe treatment of all types of wastewater in the real catchment area. Students propose a project documentation of sewerage network and wastewater treatment plant. Drawing documentation includes technical report and detailed hydrotechnic and technologic calculations. Students use computers and current software.

Language of instruction

Czech

Number of ECTS credits

4

Mode of study

Not applicable.

Department

Institute of Municipal Water Management (VHO)

Entry knowledge

Hydraulics, Hydrology, Engineering nets, Sewerage Systems, Chemistry and Water Technology, Treatment of waste water

Rules for evaluation and completion of the course

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Aims

The basic conception solution and design of drainage urban areas and treatment of waste-water from urban areas.

Study aids

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

Not applicable.

Recommended reading

Not applicable.

Classification of course in study plans

  • Programme BPC-SI Bachelor's

    specialization V , 4 year of study, summer semester, compulsory

Type of course unit

 

Project

26 hod., compulsory

Teacher / Lecturer

Syllabus

1. Task a topology. 2. Calculation of flow in the sewer and water inflow to the WWTP. 3. Hydraulic analysis in sewerage - Hydro situation sewerage. 4. Technological and height scheme of waste water treatment plants. 5. Design objects of wastewater treatment plant. 6. Longitudinal sections of the sewer systems. 7. Typical cross-section of coordination networks, design of machinery wastewater treatment plant. 8. Planned excursions, consultation. 9. The detailed situation wastewater treatment facilities. 10. Situation of the sewer network, Technical report. 11. Credit.