Přístupnostní navigace
E-application
Search Search Close
Course detail
FAST-BEA004Acad. year: 2024/2025
Geodetic horizontal and vertical control networks, auxiliary measuring networks (development, marking of points). Height systems in CR and their development. Methods of horizontal and vertical surveying, creation of control and network. Coordinate calculations. Positional accuracy. Levelling and trigonometric determination of elevation. Methods of horizontal and vertical detail survey – polar (and orthogonal) methods, surface levelling and tacheometry. Calculation of area, cubage, survey of grade line. Basic requirements of data processing and outputs of surveying activities (including technical reports).
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Entry knowledge
Rules for evaluation and completion of the course
Aims
Study aids
Prerequisites and corequisites
Basic literature
Recommended reading
Classification of course in study plans
Lecture
Teacher / Lecturer
Syllabus
1. Basic concepts and information about heights.
2. Geometric levelling.
3. Surface levelling, basic methods of survey and terrain display.
4. Area, cubage, survey of grade line.
5. Trigonometric height survey. Refraction influence.
6. Methods of detailed data collection, tacheometry.
7. Spread of electromagnetic signal through the atmosphere.
8. Processing of geodetic survey in control, finish elaborate, technical report.
9. Control of the Czech Republic.
10. Survey and processing of simple network.
The course is full of lectures available on the e-learning on Moodle.
Exercise
1. Traverses.
2. Second Automated calculation of a point (primarily software Groma).
3. Levelling instruments. Control of the Czech Republic.
4. Levelling, technical levelling.
5. Surface levelling, basic methods of survey and terrain display.
6. Trigonometric measurement of heights over long distances (curvature of Earth, influence of environment).
7. Determining the location (spatial) of an inaccessible point.
8. Tacheometry.
9. Marking of points of point fields and auxiliary measuring networks. Processing of geodetic measurements, completion of the report, technical report.
10. Credit.