Course detail

Computer Support in Construction Preparation and Realization 2

FAST-CW019Acad. year: 2024/2025

ASPE software for the planning and management of the construction of buildings and transport structures – budgets, calculations, time schedules, network graphs and other steps in the management of a building contract. Investor and supplier controlling, administration of sub-deliveries, continuous evaluation of costs and resources. Lists of jobs done, fact-finding protocols, invoicing. Planning and management of construction in the RSV system in connection with the outputs of calculation software. Importing of budgets and their use in the creation of a technology planning model, sub-contractor budgets, creation of a time schedule via linkage to MS-Project, creation and printing of documentation for construction execution.

Language of instruction

Czech

Number of ECTS credits

5

Mode of study

Not applicable.

Department

Institute of Technology, Mechanisation and Construction Management (TST)

Entry knowledge

Knowledge of the rules for budgeting, good understanding of construction technologies, common user-level knowledge of work with office applications.

Rules for evaluation and completion of the course

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Aims

To get knowledge of software aid in construction process planning and monitoring in an integrated company management system. The knowledge should enable individual applications and solution in line with supposed allocation of the student on site in practice.
The students will master the objective of the course consisting in application of the knowledge from previous courses at planning and management of building contracts of various characters in a building company. This includes application and modification of items of budget estimation programs, time schedules, monitoring of costs and resources, listings of performed jobs, monitoring and evaluation of the construction realization procedure.

Study aids

Not applicable.

Prerequisites and corequisites

Not applicable.

Basic literature

firemní podklady: Návody pro SW: CONTEC, MS-Project, RTS-BuildPower, RSV, KROS Plus. 0. (CS)
Haas,Š.: Příprava a řízení stavební výroby. SNTL, Praha, 1990. (CS)
Jarský, Č., Musil, F., Svoboda ,P., Gašparík, J., Motyčka, V., Pospíchal, V. Kovářová, B., Vyčítal, M. Příprava a realizace staveb. Cerm s.r.o. Brno, 2019. (CS)

Recommended reading

Not applicable.

Type of course unit

 

Lecture

13 hod., optionally

Teacher / Lecturer

Syllabus

1. General options for the use of ASPE software in construction planning and management. 2. Data available for use by the ASPE system – default and adopted ÚRS price lists. 3. Dials and settings of the ASPE programme, parameters of the construction process, budgets, construction execution and time schedules. 4. Construction execution, budgets and time schedules in the ASPE environment. Creation of budgets and calculated bids, time schedule options, network graphs, critical path calculations. 5. Contract solution variants, creation of supplier variants. Documents for construction execution in the ASPE environment – work – progress, invoicing, charge orders 6. Other ASPE options – construction phases, budget re-evaluation, large-scale changes. 7. Building production management using the RSV programme, general functionality. 8. Procedure for the implementation of the RSV system in a real construction company environment. Input data for contract management. 9. Record-keeping with regard to documentation for orders, bids and construction planning in the RSV system. Importing the budget and technology planning model for a contract, creation of sub-contractor budgets. 10. Connectivity of RSV to Microsoft Project, time scheduling and its linkage to a technology planning model. Outputs and execution of construction: list of jobs done, evaluation of costs and resources in the RSV system.

Exercise

26 hod., compulsory

Teacher / Lecturer

Syllabus

1. Introduction to practical classes, materials needed for work, operating rules for the computer room, requirements for the credit. 2. Basic introduction to the ASPE programme, description of the environment. Creation the “production plan” type of project structure . 3. Project type estimate – direct prices, estimate – calculations 4. Time schedule-type project structures , connections, creating a network graph, critical path. 5. Budget additions, fact-finding protocols, invoicing. 6. Basic introduction to the RSV programme, structure of the programme, control elements. 7. Creating of a contract , basic information about the contract. 8. Bidding processes in RSV. 9. Processes involved in construction planning and execution in RSV. 10. Testing of knowledge, user skills, credit.