Course detail
Project – Building Constructions
FAST-BHA017Acad. year: 2025/2026
Throughout the practices of this particular course the students are to work on part of the building design documentation for building permit application of an individually assigned building. The drawings and reports they make should respect the latest amendments of Building Code and accompanying decrees as well as the latest standards. The individually assigned building should be a detached or semi-detached house with a simple disposition, and a partial or full basement. Also, it should have at most 2 above ground storeys, whereas the second floor can be replaced by a loft space. While the students are working on the building documentation (drawings, reports) they are to demonstrate their knowledge regarding building construction, structural mechanics, building physics, … - therefore the knowledge they obtained by studying at the university. Albeit that’s not all, with this approach the students will acquire some skills helpful for them into the future. In general, some skill related to individual work or work in groups.
Language of instruction
Number of ECTS credits
Mode of study
Guarantor
Department
Entry knowledge
Rules for evaluation and completion of the course
Aims
The target is to complete this simply building to present it for building licence.
Student is able to design the complex project of a simple buidling and its constructions and technical drawings in accordance of the technical standard requirements.
Study aids
Prerequisites and corequisites
Basic literature
Recommended reading
Classification of course in study plans
Type of course unit
Project
Teacher / Lecturer
Syllabus
- 1. Introduction to practices. Building design documentation decree – A Primary accompanying report. B – Summary technical report.
- 2. Building documentation decree – C Site and block plans.
- 3. Location plan. Site plan. Block plan.
- 4. Plans of each floor. In case of 4 and multi-storey buildings at least 3 floor plans are to be drawn (1st basement, 1st above ground floor and last floor).
- 5. Formwork drawing of 2NP floor and roof / attic space.
- 6. Roof construction drawing (flat or pitched roof) – plan and sections.
- 7. Foundation plan drawing.
- 8. Stairway design. Supplementing the floor plans by stairway.
- 9. Simplified thermo-technical analyses of structures (1x wall composition, 1x floor composition).
- 10. Longitudinal and transversal section.
- 11. Elevations.
- 12. Primary accompanying report.
- 13. Submission and final evaluation of presented work.