Přístupnostní navigace
E-přihláška
Vyhledávání Vyhledat Zavřít
Detail publikace
ŠTĚRBA, M. ČECH, D. VENKRBEC, V. MOTYČKA, V.
Originální název
Formwork demands on crane operation
Typ
článek v časopise - ostatní, Jost
Jazyk
angličtina
Originální abstrakt
Before the construction outset it is not possible to precisely define the demands on the crane operation. Nevertheless, it is necessary to define the real demands as precisely as possible. The only way to reach this is to determine the process that will require the biggest demands during the construction. System formworks in monolithic assembled constructions appear to be very demanding. The article shows the requirements during the mounting of system formwork by cranes. It further indicates considerable differences among time norms in planning programs. Time norms in the planning programs are compared with the time reality in certain constructions at the end of the article.
Klíčová slova
Operation, element, system, construction, transfer.
Autoři
ŠTĚRBA, M.; ČECH, D.; VENKRBEC, V.; MOTYČKA, V.
Rok RIV
2013
Vydáno
10. 6. 2013
Nakladatel
Info Invest Ltd, Bulgaria
Místo
Sunny Beach, Bulgaria
ISSN
1313-2539
Periodikum
Journal of International Scientific Publications: Materials, Methods and Technologies
Ročník
7
Číslo
2
Stát
Bulharská republika
Strany od
78
Strany do
84
Strany počet
URL
https://www.scientific-publications.net/download/materials-methods-and-technologies-2013-2.pdf
BibTex
@article{BUT100141, author="Martin {Štěrba} and David {Čech} and Václav {Venkrbec} and Vít {Motyčka}", title="Formwork demands on crane operation", journal="Journal of International Scientific Publications: Materials, Methods and Technologies", year="2013", volume="7", number="2", pages="78--84", issn="1313-2539", url="https://www.scientific-publications.net/download/materials-methods-and-technologies-2013-2.pdf" }