Detail publikace

Formwork demands on crane operation

ŠTĚRBA, M. ČECH, D. VENKRBEC, V. MOTYČKA, V.

Originální název

Formwork demands on crane operation

Typ

článek v časopise - ostatní, Jost

Jazyk

angličtina

Originální abstrakt

Before the construction outset it is not possible to precisely define the demands on the crane operation. Nevertheless, it is necessary to define the real demands as precisely as possible. The only way to reach this is to determine the process that will require the biggest demands during the construction. System formworks in monolithic assembled constructions appear to be very demanding. The article shows the requirements during the mounting of system formwork by cranes. It further indicates considerable differences among time norms in planning programs. Time norms in the planning programs are compared with the time reality in certain constructions at the end of the article.

Klíčová slova

Operation, element, system, construction, transfer.

Autoři

ŠTĚRBA, M.; ČECH, D.; VENKRBEC, V.; MOTYČKA, V.

Rok RIV

2013

Vydáno

10. 6. 2013

Nakladatel

Info Invest Ltd, Bulgaria

Místo

Sunny Beach, Bulgaria

ISSN

1313-2539

Periodikum

Journal of International Scientific Publications: Materials, Methods and Technologies

Ročník

7

Číslo

2

Stát

Bulharská republika

Strany od

78

Strany do

84

Strany počet

7

URL

BibTex

@article{BUT100141,
  author="Martin {Štěrba} and David {Čech} and Václav {Venkrbec} and Vít {Motyčka}",
  title="Formwork demands on crane operation",
  journal="Journal of International Scientific Publications: Materials, Methods and Technologies",
  year="2013",
  volume="7",
  number="2",
  pages="78--84",
  issn="1313-2539",
  url="https://www.scientific-publications.net/download/materials-methods-and-technologies-2013-2.pdf"
}