Detail publikace

The earth-fill dam of the Karolinka water reservoir monitored by the EIS method (2016)

PAŘÍLKOVÁ, J. ZACHOVAL, Z. PAŘÍLEK, L.

Originální název

The earth-fill dam of the Karolinka water reservoir monitored by the EIS method (2016)

Typ

článek ve sborníku ve WoS nebo Scopus

Jazyk

angličtina

Originální abstrakt

This paper informs about the results of monitoring electrical properties of the soil of the body of the earth-fill dam of the Karolinka water reservoir in the third year after its reconstruction ended. Monitoring is carried out using a Z-meter device when applying the method of electrical impedance spectrometry and is part of a system of monitoring seepage through the earth-fill dam of the water reservoir by its administrator. Information about the changes that take place in the body of the dam before and after the measures (the construction of a cut-off wall when the dam was reconstructed in 2013) were implemented is given through the monitored changes in electrical conductance of the soil of the dam with time.

Klíčová slova

EIS (electrical impedance spectrometry), Z-meter device, soil, seepage, Karolinka dam and reservoir

Autoři

PAŘÍLKOVÁ, J.; ZACHOVAL, Z.; PAŘÍLEK, L.

Vydáno

13. 10. 2016

Nakladatel

Brno University of Technology, VUTIUM

Místo

Brno

ISBN

978-80-214-5338-8

Kniha

EUREKA 2016 - 4th conference and working session

Edice

neuv

Číslo edice

1

ISSN

2464-4595

Periodikum

EUREKA

Ročník

1

Číslo

1

Stát

Česká republika

Strany od

185

Strany do

209

Strany počet

25

BibTex

@inproceedings{BUT131938,
  author="Jana {Pařílková} and Zbyněk {Zachoval} and Luboš {Pařílek}",
  title="The earth-fill dam of the Karolinka water reservoir monitored by the EIS method (2016)",
  booktitle="EUREKA 2016 - 4th conference and working session",
  year="2016",
  series="neuv",
  journal="EUREKA",
  volume="1",
  number="1",
  pages="185--209",
  publisher="Brno University of Technology, VUTIUM",
  address="Brno",
  isbn="978-80-214-5338-8",
  issn="2464-4595"
}