MOTYČKA, V. KLEMPA, L.
Originální název
Scheduling of tower cranes on construction sites
Typ
článek ve sborníku ve WoS nebo Scopus
Jazyk
angličtina
Originální abstrakt
The currently-used procedures for the proposal of cranes are based on various input indicators which only characterize the requirements for the transport of materials very roughly. The results achieved on the basis of such procedures are of varying quality, but mostly only very approximate. The capacity of the proposed cranes to supply all construction processes in the required time is not being evaluated sufficiently. The following contribution describes new, more precise ways of dealing with this task, i.e. a proposal for an evaluation procedure to determine whether proposed secondary transport using tower cranes corresponds to the transport requirements set out in the schedule for continuous construction sub-processes.
Klíčová slova
secondary transport, scheduling, tower cran, construction sites
Autoři
MOTYČKA, V.; KLEMPA, L.
Vydáno
6. 12. 2016
Nakladatel
Taylor and Francis Group
Místo
London
ISBN
978-1-138-03224-8
Kniha
Advances and Trends in Engineering Sciences and Technologies III
Strany od
567
Strany do
573
Strany počet
6
BibTex
@inproceedings{BUT132554, author="Vít {Motyčka} and Lukáš {Klempa}", title="Scheduling of tower cranes on construction sites", booktitle="Advances and Trends in Engineering Sciences and Technologies III", year="2016", pages="567--573", publisher="Taylor and Francis Group", address="London", isbn="978-1-138-03224-8" }