Risk analysis using Factor Method

TEPLÝ, B., KERŠNER, Z., ROVNANÍKOVÁ, P.

Originální název

Risk analysis using Factor Method

Anglický název

Risk analysis using Factor Method

Typ

článek ve sborníku ve WoS nebo Scopus

Jazyk

čeština

Originální abstrakt

According to EC regulation SEVESO II the quantification of risk has to be analysed for chemical industrial plants or infrastructure and passed on the state authorities. In certain situations the evaluation of hazard scenarios are based on the structural lifetime consideration. In such cases the Factor Method for the prediction of the lifetime may be utilized. Its probabilistic from has been formulated by considering the individual factors to be random variables and reflecting the potential damage of the structural materials due to different chemical compounds. The limit function is constructed considering the target value of structural lifetime. The relevant probability is computed by a suitable simulation technique. A case study a concrete sewage plant assessment is presented for two limiting situations.

Anglický abstrakt

According to EC regulation SEVESO II the quantification of risk has to be analysed for chemical industrial plants or infrastructure and passed on the state authorities. In certain situations the evaluation of hazard scenarios are based on the structural lifetime consideration. In such cases the Factor Method for the prediction of the lifetime may be utilized. Its probabilistic from has been formulated by considering the individual factors to be random variables and reflecting the potential damage of the structural materials due to different chemical compounds. The limit function is constructed considering the target value of structural lifetime. The relevant probability is computed by a suitable simulation technique. A case study a concrete sewage plant assessment is presented for two limiting situations.

Klíčová slova v angličtině

Factor method, probability, risk, sewage plant, chemical stressors

Autoři

TEPLÝ, B., KERŠNER, Z., ROVNANÍKOVÁ, P.

Vydáno

1. 1. 2003

Nakladatel

Politecnico di Milano

Místo

Milano

ISBN

88-387-2935-2

Kniha

Management of Durability in the Building Process

Strany od

1

Strany do

6

Strany počet

6

BibTex

@inproceedings{BUT13285,
  author="Břetislav {Teplý} and Zbyněk {Keršner} and Pavla {Rovnaníková}",
  title="Risk analysis using Factor Method",
  booktitle="Management of Durability in the Building Process",
  year="2003",
  pages="6",
  publisher="Politecnico di Milano",
  address="Milano",
  isbn="88-387-2935-2"
}