KŘÍŽOVSKÁ, E. PUCHÝŘ, B. VAŇKOVÁ, L.
Originální název
RISK MANAGEMENT OF AN INSUFFICIENTLY ELABORATE PROJECT DOCUMENTATION
Typ
článek v časopise - ostatní, Jost
Jazyk
angličtina
Originální abstrakt
This contribution is aimed at the problems of an active access of a middle-size building enterprise of a regional significance to a management of a risk of an insufficiently elaborate project documentation. It goes out from the year 2013, when consequences of a financial crisis whose general phenomenon was that orders of building enterprises were voluminously and financially lower, died away in the Czech Republic. Building enterprises often found themselves in a situation when they were made to realize building orders on the basis of the elaborate project documentation of poor quality. These pieces of knowledge are practically applied to the examined building enterprise X1 s.r.o. which fought a lack of building orders in 2013 and therefore when it succeeded in selective proceedings on a construction of four row family houses, it was made to take this order and to realize it on the basis of a building permit documentation of poor quality. Because one of the authors of this article worked as an assistant of a master builder during a construction and elaborated all budgets connected with the given building order, the other authors of the contribution could also cooperate with the master builder, the investor, the technical supervisor of the investor and the projector of the structure on a removal of particular mistakes and imperfections included in the project. By means of this active cooperation, the project documentation risk was successfully eliminated in the end, the planned budgetary costs were kept and the contracting fine which the building enterprise X1 s.r.o. would have been liable to pay in case of a failure of a term of a work completion was avoided. This contribution can be divided into two main parts, namely into theoretical and practical ones. While the theoretical part of the article is intent on the basic concepts connected with the problems of the project documentation risk, its practical part includes a complete project documentation of realized row family houses, namely including ascertained mistakes and imperfections, further on, budgetary costs and proposed measures for a reduction or an elimination of a risk associated with a project documentation. The aim of the contribution is on the basis of own experience to elaborate lucidly the problems of the project documentation risk and to demonstrate these pieces of knowledge on the concrete project of the examined building enterprise, further on, to propose measures for a reduction or an elimination of the risk associated with the project documentation and to draw attention to an importance of a choice of a right projector.
Klíčová slova
Building Work Construction; Building Process Risk; Project Documentation Risk; Possibility of Project Documentation Influence; Projector; Master Builder; Examined Building Enterprise X1 s.r.o.
Autoři
KŘÍŽOVSKÁ, E.; PUCHÝŘ, B.; VAŇKOVÁ, L.
Vydáno
28. 2. 2018
Nakladatel
Slovenská technická univerzita v Bratislave
Místo
Bratislava
ISSN
1338-0370
Periodikum
Terra Spectra
Číslo
2/2017
Stát
Slovenská republika
Strany od
22
Strany do
33
Strany počet
11
BibTex
@article{BUT149868, author="Eliška {Křížovská} and Bohumil {Puchýř} and Lucie {Vaňková}", title="RISK MANAGEMENT OF AN INSUFFICIENTLY ELABORATE PROJECT DOCUMENTATION ", journal="Terra Spectra", year="2018", number="2/2017", pages="22--33", issn="1338-0370" }