Detail publikace

Enhancing Production Overhead Cost Estimation for Construction Contracts: Case Study of Bridges

VÍTKOVÁ, E. HANÁK, T. ŠČEVÍK, V.

Originální název

Enhancing Production Overhead Cost Estimation for Construction Contracts: Case Study of Bridges

Typ

kapitola v knize

Jazyk

angličtina

Originální abstrakt

This research examines the issue of production overhead costs estimation in construction companies. The case study approach has been selected in order to analyse the significance and variability of production overhead costs on a sample of 16 construction contracts. The study focuses on one specific type of small-scale construction contracts, where the subject was constructions, repairs, or improvements to bridge structures. In the analytical part, three research hypotheses have been evaluated in order to address the effects of production overhead costs and project size in its financial perspective on project profit. Based on the findings, proposals for an enhanced estimation of production overhead costs are provided.

Klíčová slova

bridge; construction company; estimation; overhead costs; project management

Autoři

VÍTKOVÁ, E.; HANÁK, T.; ŠČEVÍK, V.

Vydáno

1. 10. 2018

Nakladatel

Politechnika Krakowska

Místo

Kraków, Poland

ISBN

978-83-65991-42-3

Kniha

Planning and organisation in modern construction – selected aspects

Strany od

11

Strany do

32

Strany počet

20

URL

BibTex

@inbook{BUT156350,
  author="Eva {Vítková} and Tomáš {Hanák} and Vojtěch {Ščevík}",
  title="Enhancing Production Overhead Cost Estimation for Construction Contracts: Case Study of Bridges",
  booktitle="Planning and organisation in modern construction – selected aspects",
  year="2018",
  publisher="Politechnika Krakowska",
  address="Kraków, Poland",
  pages="11--32",
  isbn="978-83-65991-42-3",
  url="http://suw.biblos.pk.edu.pl/resourceDetailsBPP&rId=86532"
}