Přístupnostní navigace
E-přihláška
Vyhledávání Vyhledat Zavřít
Detail publikace
JULÍNEK, T. ŘÍHA, J.
Originální název
MULTICRITERIAL EVALUATION OF THE BÍLINA RIVER REVITALIZATION
Typ
článek ve sborníku ve WoS nebo Scopus
Jazyk
angličtina
Originální abstrakt
The Ervenice Corridor (EC) is a massive embankment of a height up to 170 m and a length of about 11 km in the area of the surface coal mine. One of the arrangements during the mining was a relocation of 3 km long river reach of the Bílina River into four steel pipelines located on the crest of the Corridor. As the mining is gradually attenuating and principal settlements have gone, the river basin authority is looking for more environmental solutions including revitalization of the Bílina River along the EC. The paper describes a formalized
Klíčová slova
river revitalisation, multi-criteria analysis, surface coal mine
Autoři
JULÍNEK, T.; ŘÍHA, J.
Vydáno
5. 9. 2019
Nakladatel
Ss Cyril and Methodius University, Civil Engineering Faculty, Skopje
Místo
Skopje
ISBN
978-608-4510-33-8
Kniha
WHME 16th International Symposium Water Management - Hydralic Engineering
Strany od
377
Strany do
386
Strany počet
10
URL
http://194.149.145.120/
BibTex
@inproceedings{BUT158552, author="Tomáš {Julínek} and Jaromír {Říha}", title="MULTICRITERIAL EVALUATION OF THE BÍLINA RIVER REVITALIZATION", booktitle="WHME 16th International Symposium Water Management - Hydralic Engineering", year="2019", pages="377--386", publisher="Ss Cyril and Methodius University, Civil Engineering Faculty, Skopje", address="Skopje", isbn="978-608-4510-33-8", url="http://194.149.145.120/" }