Detail publikace

MULTICRITERIAL EVALUATION OF THE BÍLINA RIVER REVITALIZATION

JULÍNEK, T. ŘÍHA, J.

Originální název

MULTICRITERIAL EVALUATION OF THE BÍLINA RIVER REVITALIZATION

Typ

článek ve sborníku ve WoS nebo Scopus

Jazyk

angličtina

Originální abstrakt

The Ervenice Corridor (EC) is a massive embankment of a height up to 170 m and a length of about 11 km in the area of the surface coal mine. One of the arrangements during the mining was a relocation of 3 km long river reach of the Bílina River into four steel pipelines located on the crest of the Corridor. As the mining is gradually attenuating and principal settlements have gone, the river basin authority is looking for more environmental solutions including revitalization of the Bílina River along the EC. The paper describes a formalized

Klíčová slova

river revitalisation, multi-criteria analysis, surface coal mine

Autoři

JULÍNEK, T.; ŘÍHA, J.

Vydáno

5. 9. 2019

Nakladatel

Ss Cyril and Methodius University, Civil Engineering Faculty, Skopje

Místo

Skopje

ISBN

978-608-4510-33-8

Kniha

WHME 16th International Symposium Water Management - Hydralic Engineering

Strany od

377

Strany do

386

Strany počet

10

URL

BibTex

@inproceedings{BUT158552,
  author="Tomáš {Julínek} and Jaromír {Říha}",
  title="MULTICRITERIAL EVALUATION OF THE BÍLINA RIVER
REVITALIZATION",
  booktitle="WHME 16th International Symposium Water Management - Hydralic Engineering",
  year="2019",
  pages="377--386",
  publisher="Ss Cyril and Methodius University, Civil Engineering Faculty, Skopje",
  address="Skopje",
  isbn="978-608-4510-33-8",
  url="http://194.149.145.120/"
}