Detail publikace

Comparison of the planned and actual course of construction of reinforced concrete monolithic structures

DOUBEK, R.

Originální název

Comparison of the planned and actual course of construction of reinforced concrete monolithic structures

Typ

článek ve sborníku ve WoS nebo Scopus

Jazyk

angličtina

Originální abstrakt

During construction, there is often a change in contractual terms, either in advance of construction or delayed construction. This phenomenon is due to many influencing factors such as delayed subcontracting, climatic conditions, the surrounding construction site, the quality of project documentation, the solvency of the investor, the expertise of the general contractor, etc. The aim of the paper is to assess the planned and actual construction of reinforced concrete monolithic structural elements using tower cranes. The subject of the paper is to state the expected method of implementation in time and how the construction proceeded. Milestones for accelerating and slowing down construction, analyzing their causes and proposing future measures will be presented. Data are obtained by measuring real buildings.

Klíčová slova

Contractual and actual terms, tower cranes, reinforced concrete monolithic construction, construction process

Autoři

DOUBEK, R.

Vydáno

13. 10. 2021

Nakladatel

IOP Publishing

Místo

Košice

ISSN

1757-899X

Periodikum

IOP Conference Series: Materials Science and Engineering

Ročník

1209

Číslo

1

Stát

Spojené království Velké Británie a Severního Irska

Strany od

1

Strany do

6

Strany počet

6

URL

Plný text v Digitální knihovně

BibTex

@inproceedings{BUT176459,
  author="Rostislav {Doubek}",
  title="Comparison of the planned and actual course of construction of reinforced concrete monolithic structures",
  booktitle="13th International Scientific Conference of Civil and Environmental Engineering for PhD. Students and Young Scientists 13-15 October 2021, High Tatras, Slovakia",
  year="2021",
  journal="IOP Conference Series: Materials Science and Engineering",
  volume="1209",
  number="1",
  pages="1--6",
  publisher="IOP Publishing",
  address="Košice",
  doi="10.1088/1757-899X/1209/1/012011",
  issn="1757-899X",
  url="https://iopscience.iop.org/article/10.1088/1757-899X/1209/1/012011"
}