Detail publikace

The millennium bridge

STRÁSKÝ, J., KULHAVÝ, T.

Originální název

The millennium bridge

Typ

článek v časopise - ostatní, Jost

Jazyk

angličtina

Originální abstrakt

The bicycle and foot bridge is part of a larger project involving works for the enjoyment of the park along the Medway river at Maidstone, in the UK. It was financed by the Millennium Commission and enables access to a new part, the Whatman´s Field park, recently created in an area - earlier inaccessable - located between the river and a railway line. The two-span ribbon bridge deck, of original conception, is the first example of a bridge having an elbow centreline. In fact, the centrelines of the two spans meet at an angle in plan of 25°. The bridge overal length is 101.5 m, and the maximum clear length of the main span, over the riverbed, is 49.5 m; the approach-span clear length is 37.5 m.

Klíčová slova

foot and bicycle bridge, tensioned ribbon, precast concrete segments, static and dynamic analyses, construction procedure

Autoři

STRÁSKÝ, J., KULHAVÝ, T.

Rok RIV

2003

Vydáno

1. 11. 2003

Místo

Řím

ISSN

0019-7637

Periodikum

L´industria italiana del Cemento

Ročník

2003

Číslo

792

Stát

Italská republika

Strany od

860-872

Strany počet

12