Detail publikace

LONG-TERM MONITORING OF COMPOSITE BRIDGE ACROSS ODRA RIVER ON THE D47 FREEWAY

ZICH, M. DANĚK, P. SLÁNSKÝ, B.

Originální název

LONG-TERM MONITORING OF COMPOSITE BRIDGE ACROSS ODRA RIVER ON THE D47 FREEWAY

Typ

článek v časopise ve Scopus, Jsc

Jazyk

angličtina

Originální abstrakt

The article presents the results and analysis of long-term monitoring of the bridge across the Odra River on the D47 freeway in the Czech Republic near Ostrava. Structural system of this bridge is formed by a continuous composite box girder with spans from 49 to 102 m. Total length of the bridge is 402 m. The bridge was equipped by strain gauges and force sensors during the construction. The monitoring has been kept on for 10 years. The measured values are compared with the results of calculations

Klíčová slova

bridge, , composite structure, long-term monitoring, material testing, strain gauges

Autoři

ZICH, M.; DANĚK, P.; SLÁNSKÝ, B.

Vydáno

1. 5. 2016

Nakladatel

Trans Tech Publications Ltd

Místo

Switzerland

ISBN

978-3-03835-526-7

Kniha

Reliability Aspects in the Design and Execution of Concrete Structures

Edice

1

Číslo edice

1

ISSN

1013-9826

Periodikum

Key Engineering Materials (print)

Ročník

2016

Číslo

691

Stát

Švýcarská konfederace

Strany od

259

Strany do

271

Strany počet

4

URL

BibTex

@article{BUT170328,
  author="Miloš {Zich} and Petr {Daněk} and Bohuslav {Slánský}",
  title="LONG-TERM MONITORING OF COMPOSITE BRIDGE ACROSS ODRA RIVER ON THE D47 FREEWAY",
  journal="Key Engineering Materials (print)",
  year="2016",
  volume="2016",
  number="691",
  pages="259--271",
  doi="10.4028/www.scientific.net/KEM.691.259",
  issn="1013-9826",
  url="https://www.scientific.net/KEM.691.259"
}