Detail publikace

Flow Shop Scheduling with Fuzzy Due Dates and Fuzzy Processing Times

DVOŘÁK, J.

Originální název

Flow Shop Scheduling with Fuzzy Due Dates and Fuzzy Processing Times

Typ

článek ve sborníku ve WoS nebo Scopus

Jazyk

angličtina

Originální abstrakt

This paper deals with a permutation flow shop scheduling problem under uncertainty modelled by using the fuzzy set theory. Two fuzzy modifications of the conventional deterministic problem are described. The first one treats the case where a due date of each job is uncertain, the second one assumes an uncertain processing time of each job on each machine. We propose several approaches to combining these cases and present preliminary computational results obtained by means of stochastic heuristic methods.

Klíčová slova v angličtině

Flow shop scheduling, fuzzy constraints, stochastic heuristic methods

Autoři

DVOŘÁK, J.

Vydáno

1. 6. 1999

Nakladatel

VUT v Brně

Místo

Brno

ISBN

80-214-1131-7

Kniha

5th International Conference on Soft Computing MENDEL ‘99

Strany od

228

Strany do

235

Strany počet

8

BibTex

@inproceedings{BUT20802,
  author="Jiří {Dvořák} and Miloš {Šeda} and Petr {Majer}",
  title="Flow Shop Scheduling with Fuzzy Due Dates and Fuzzy Processing Times",
  booktitle="5th International Conference on Soft Computing MENDEL ‘99",
  year="1999",
  pages="8",
  publisher="VUT v Brně",
  address="Brno",
  isbn="80-214-1131-7"
}