ŠEDA, M.
Originální název
Flexible Heuristics for Project Scheduling with Limited Resources
Typ
článek v časopise - ostatní, Jost
Jazyk
angličtina
Originální abstrakt
Resource-constrained project scheduling is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed immediately and which should be postponed and investigate the resource-constrained project scheduling problem (RCPSP) from the implementation point of view. We propose an efficient routine that, instead of shifting the activities, extends their duration. It makes it possible to break down their duration into active and sleeping subintervals. Then we can apply the classical Critical Path Method that needs only polynomial running time. This algorithm can simply be adapted for multiproject scheduling with limited resources.
Klíčová slova
project management, resource-constrained scheduling, NP-hard problem, CPM, heuristic method
Autoři
Rok RIV
2007
Vydáno
1. 10. 2007
ISSN
1307-6906
Periodikum
International Journal of Applied Mathematics and Computer Science
Ročník
4
Číslo
Stát
Turecká republika
Strany od
196
Strany do
200
Strany počet
5
BibTex
@article{BUT44681, author="Miloš {Šeda}", title="Flexible Heuristics for Project Scheduling with Limited Resources", journal="International Journal of Applied Mathematics and Computer Science", year="2007", volume="4", number="4", pages="196--200", issn="1307-6906" }