Detail publikace

LONG-TERMS OBSERVATION OF BRIDGE STRUCTURES, CABLE-STAYED BRIDGE

ZICH, M.

Originální název

LONG-TERMS OBSERVATION OF BRIDGE STRUCTURES, CABLE-STAYED BRIDGE

Typ

kapitola v knize

Jazyk

angličtina

Originální abstrakt

In the frame of the previous Technical papers and reports, general methodical and conceptual approach to long-terms observation of bridges was designed. The approach is recently being applied on an example of a cable-stayed bridge across the Odra River and Antošovice ponds on D47 highway. Within the paper are concluded up to now obtained data (about carried out observation, supporting tests in the course of construction, etc) necessary for implementation of specified time analyse of the bridge.

Klíčová slova

beton, dlouhodobé sledování, most

Autoři

ZICH, M.

Vydáno

30. 11. 2007

Nakladatel

Nakladatelství ČVUT

Místo

Praha

ISBN

978-80-01-04179-6

Kniha

Technical Sheets 2007 Part 2: Application of Advaced materials in Integrated Design of Structures

Edice

1

Číslo edice

1

Strany od

69

Strany do

70

Strany počet

2

BibTex

@inbook{BUT55844,
  author="Miloš {Zich}",
  title="LONG-TERMS OBSERVATION OF BRIDGE STRUCTURES, CABLE-STAYED BRIDGE",
  booktitle="Technical Sheets 2007 Part 2: Application of Advaced materials in Integrated Design of Structures",
  year="2007",
  publisher="Nakladatelství ČVUT",
  address="Praha",
  series="1",
  edition="1",
  pages="69--70",
  isbn="978-80-01-04179-6"
}