ŠEDA, M.
Originální název
A New Implementation of the Critical Path Method Using Lexicographical Ordering of Edges
Typ
článek ve sborníku ve WoS nebo Scopus
Jazyk
angličtina
Originální abstrakt
Critical Path Method (CPM) is well known tool in project scheduling where time duration of activities and their precedence relationships are defined and resource capacities are not limited. In practice it usually is not satisfied. In spite of this, the CPM is a base of more general methods as PERT, solving the Resource Constrained Project Scheduling Problem (RCPSP), and Job Shop Scheduling Problem (JSSP) when it is represented by the disjunctive graph. RCPSP and JSSP are NP-hard problems and therefore it is necessary to solve them by heuristic methods. Here, with respect to high number of iterations, the effectiveness of the CPM calculations plays a substantial role. This contribution proposes a new implementation of the CPM using a lexicographical ordering of edges in network graphs and shows that its time complexity is lower than the time complexity of classical approaches. This conclusion is verified using the representative class of benchmarks.
Klíčová slova v angličtině
CPM, PERT, time complexity, lexicographical ordering
Autoři
Rok RIV
2001
Vydáno
5. 5. 2001
Nakladatel
MARQ Ostrava
Místo
Ostrava
ISBN
80-85988-57-7
Kniha
Proceedings of the 35th Spring International Conference Modelling and Simulation of Systems MOSIS '01
Strany od
333
Strany do
338
Strany počet
6
BibTex
@inproceedings{BUT6611, author="Miloš {Šeda}", title="A New Implementation of the Critical Path Method Using Lexicographical Ordering of Edges", booktitle="Proceedings of the 35th Spring International Conference Modelling and Simulation of Systems MOSIS '01", year="2001", pages="6", publisher="MARQ Ostrava", address="Ostrava", isbn="80-85988-57-7" }