Přístupnostní navigace
E-přihláška
Vyhledávání Vyhledat Zavřít
Detail publikace
DVOŘÁK, J., ŠEDA, M., MAJER, P.
Originální název
Flow Shop Scheduling with Fuzzy Due Dates and Fuzzy Processing Times
Typ
článek ve sborníku ve WoS nebo Scopus
Jazyk
angličtina
Originální abstrakt
This paper deals with a permutation flow shop scheduling problem under uncertainty modelled by using the fuzzy set theory. Two fuzzy modifications of the conventional deterministic problem are described. The first one treats the case where a due date of each job is uncertain, the second one assumes an uncertain processing time of each job on each machine. We propose several approaches to combining these cases and present preliminary computational results obtained by means of stochastic heuristic methods.
Klíčová slova v angličtině
flow shop scheduling, fuzzy constraints, stochastic heuristic methods
Autoři
Rok RIV
1999
Vydáno
1. 6. 1999
Nakladatel
VUT FSI ÚAI
Místo
Brno, ČR
ISBN
80-214-1131-7
Kniha
Mendel '99. 5th International Conference on Soft Computing
Strany od
228
Strany do
235
Strany počet
8
BibTex
@inproceedings{BUT93, author="Jiří {Dvořák} and Miloš {Šeda} and Petr {Majer}", title="Flow Shop Scheduling with Fuzzy Due Dates and Fuzzy Processing Times", booktitle="Mendel '99. 5th International Conference on Soft Computing", year="1999", pages="8", publisher="VUT FSI ÚAI", address="Brno, ČR", isbn="80-214-1131-7" }