Project detail

SIMPLAN Optimal - Optimisation of production and distribution systems using simulation methods

Duration: 01.01.1998 — 31.12.2000

Funding resources

Czech Science Foundation - Standardní projekty

- whole funder

On the project

Description in English
The new proposal will continue in R/D work initiated by grant project GAČR 101/94/0547 "Software system for production planning and scheduling in SME using a simulation model". SIMPLAN - the system for production planning and scheduling using a simulation model of production facilities was created. Using SIMPLAN the managers are able to do effective plans and schedules and they are able to predict the state of production. This system allows to evaluate different alternatives, responsive to changes in production plans effected by delays of materials, breakdowns, new orders etc. The aims of proposal project are: l. To analyse optimisation methods applicable for solving of optimisation tasks of discrete systems (in manufacturing and agriculture) 2. To develop a methodology using simulation methods for optimisation of production and distributive systems in manufacturing and agriculture, suitable for Czech economy conditions 3. To develop optimisation system based on simulation mode

Mark

GA101/98/0129

Default language

Czech

People responsible

Simeonov Simeon, doc. Ing., CSc. - principal person responsible

Units

Faculty of Mechanical Engineering
- (1998-01-01 - 2000-12-31)

Results

SIMEONOV, S. Optimalizace výrobních a distribučních systémů za využití simulačních metod. neuvedeno. 2001. s. 35 ( s.)
Detail

SIMEONOV, S. Production Optimization using FACTOR/AIM Optimization Module. In European Simulation Multiconference 2001. 2001. p. 97 ( p.)ISBN: 1-56555-225-3.
Detail