Přístupnostní navigace
E-přihláška
Vyhledávání Vyhledat Zavřít
Detail projektu
Období řešení: 01.01.1998 — 31.12.2000
Zdroje financování
Grantová agentura České republiky - Standardní projekty
- plně financující
O projektu
Popis anglickyThe new proposal will continue in R/D work initiated by grant project GAČR 101/94/0547 "Software system for production planning and scheduling in SME using a simulation model". SIMPLAN - the system for production planning and scheduling using a simulation model of production facilities was created. Using SIMPLAN the managers are able to do effective plans and schedules and they are able to predict the state of production. This system allows to evaluate different alternatives, responsive to changes in production plans effected by delays of materials, breakdowns, new orders etc. The aims of proposal project are: l. To analyse optimisation methods applicable for solving of optimisation tasks of discrete systems (in manufacturing and agriculture) 2. To develop a methodology using simulation methods for optimisation of production and distributive systems in manufacturing and agriculture, suitable for Czech economy conditions 3. To develop optimisation system based on simulation mode
Označení
GA101/98/0129
Originální jazyk
čeština
Řešitelé
Simeonov Simeon, doc. Ing., CSc. - hlavní řešitel
Útvary
Fakulta strojního inženýrství- příjemce (01.01.1998 - 31.12.2000)
Výsledky
SIMEONOV, S. Optimalizace výrobních a distribučních systémů za využití simulačních metod. neuvedeno. 2001. s. 35 ( s.)Detail
SIMEONOV, S. Production Optimization using FACTOR/AIM Optimization Module. In European Simulation Multiconference 2001. 2001. p. 97 ( p.)ISBN: 1-56555-225-3.Detail