Přístupnostní navigace
E-application
Search Search Close
Project detail
Duration: 01.01.2008 — 31.12.2009
Funding resources
Ministerstvo školství, mládeže a tělovýchovy ČR - KONTAKT
- whole funder (2008-01-01 - not assigned)
On the project
The main objective of this project is to define and improve the current knowledge gaps and methods development for risk analysis and vulnerability assessment of urban water infrastructure. The complete life-cycle will be comprised of e.g. planning, design, construction, operation, maintenance and rehabilitation of this infrastructure from aspect of potential hazards and vulnerability including the possibility of implementation/application of innovative technologies (modelling, real time measurement andcontrol, early warning, ...). The risk analysis for water supply will be solved for quantitative aspects (risk analysis of non-provision of required amount of water supply in the given time) and qualitative aspects (risk analysis of non-provision of water supply of required quality defined by relevant legislation, guidelines and standards). The risk analysis for waste water infrastructure will focus on the ?serviceability? of the whole system including failure management for sewer lines (infiltratio
KeywordsVulnerability, Risk Analysis, Urban Water Infrastructure
Mark
MEB060803
Default language
English
People responsible
Kučera Tomáš, doc. Ing., Ph.D. - fellow researcherPapírník Václav, Ing. - fellow researcherRučka Jan, Ing., Ph.D. - fellow researcherTuhovčák Ladislav, doc. Ing., CSc. - principal person responsible
Units
Institute of Municipal Water Management- beneficiary (2008-01-01 - not assigned)