Publication detail

Performance of centralised trigeneration plant on sensitivity analysis of total site system

Jamaluddin, K., Alwi, S.R.W., Manan, Z.A., Hamzah, K., Klemeš, J.J.

Original Title

Performance of centralised trigeneration plant on sensitivity analysis of total site system

Type

conference paper

Language

English

Original Abstract

The progressive rising of high living standards and populations’ growth has led to increasing energy demands. This has led to the energy shortage gap in both developing and developed countries. Government is developing new technology to increase the thermal efficiency of existing power systems. Trigeneration is one of the innovations that can increase the performance of power systems by reusing waste energy for heating and cooling applications. Pinch Analysis (PA) is a methodology that has been commonly applied for more than 40 years to design and optimum configurations of various resource networks. Previous studies have been performed optimisation of trigeneration system in a Total Site system based on the PA method called Trigeneration System Cascade Analysis (TriGenSCA). However, the previous study does not consider the performance of the trigeneration system through overall sensitivity analysis of Total Site system. Overall sensitivity analysis of the Total Site system that includes industrial plant's maintenance shutdown and production changes affected the performance of the centralized trigeneration system to generate energy to be supplied to the demands. Through this analysis, the size of the trigeneration system and back-up system can be estimated taking into consideration data fluctuations probability. The methodology has been tested on the centralized nuclear trigeneration system in a Total Site system considering four industrial plants as a case study, leading to extra 3.1 MW of Low-Pressure Steam (LPS) and 7.15 MW of Hot Water (HW) are needed from the back-up system if Plant B is shut down as well as extra of 82.4 MW of HW is needed by the back-up system if Plant C is shut down. The size of the boiler and condensate system, hence, need to be improved to overcome the deficit energy as the Plants B and C are shut down. © 2020 Institute of Physics Publishing. All rights reserved.

Keywords

Performance; centralised; trigeneration plant; sensitivity analysis; total site system

Authors

Jamaluddin, K., Alwi, S.R.W., Manan, Z.A., Hamzah, K., Klemeš, J.J.

Released

22. 12. 2020

Publisher

IOP Publishing Ltd

ISBN

1757-8981

Periodical

IOP Conference Series: Materials Science and Engineering

Year of study

1

Number

991

State

United Kingdom of Great Britain and Northern Ireland

Pages from

012141

Pages to

012141

Pages count

13

URL

BibTex

@inproceedings{BUT168256,
  author="Jiří {Klemeš}",
  title="Performance of centralised trigeneration plant on sensitivity analysis of total site system",
  booktitle="IOP Conference Series: Materials Science and Engineering",
  year="2020",
  journal="IOP Conference Series: Materials Science and Engineering",
  volume="1",
  number="991",
  pages="012141--012141",
  publisher="IOP Publishing Ltd",
  doi="10.1088/1757-899X/991/1/012141",
  issn="1757-8981",
  url="https://iopscience.iop.org/article/10.1088/1757-899X/991/1/012141"
}