Přístupnostní navigace
E-application
Search Search Close
Publication detail
DOMSITZOVÁ, M. SCHNEIDER, R.
Original Title
Application of project management tools in early planning phases to optimize the impact on quality, cost and time: A case study
Type
conference paper
Language
English
Original Abstract
The challenge of project management is to optimize the quality, cost and time parameters to smooth the implementation of the customer’s order as much as possible. This study introduces the possibilities of the performance implementation control, taking into account individual dependencies between the quality, cost and time - three aspects of the iron triangle. An already finished project that had to be completely redesigned during the fully running planning phase was used as a case study for implementing the tolls of Project Management and there impact.
Keywords
Project management; Early planning phases; constructions
Authors
DOMSITZOVÁ, M.; SCHNEIDER, R.
Released
9. 8. 2023
Publisher
AIP Publishing
Location
Melville, NY
ISBN
1551-7616
Periodical
AIP Conference Proceedings
Year of study
2887
Number
1
State
United States of America
Pages from
Pages to
6
Pages count
URL
https://pubs.aip.org/aip/acp/article/2887/1/020028/2906319/Connecting-performance-measurement-systems-with
BibTex
@inproceedings{BUT184370, author="Monika {Domsitzová} and Roland {Schneider}", title="Application of project management tools in early planning phases to optimize the impact on quality, cost and time: A case study", booktitle="14TH CONFERENCE OF CIVIL AND ENVIRONMENTAL ENGINEERING FOR PHD STUDENTS AND YOUNG SCIENTISTS: YOUNG SCIENTIST 2022 (YS22)", year="2023", journal="AIP Conference Proceedings", volume="2887", number="1", pages="1--6", publisher="AIP Publishing", address="Melville, NY", doi="10.1063/5.0158899", issn="1551-7616", url="https://pubs.aip.org/aip/acp/article/2887/1/020028/2906319/Connecting-performance-measurement-systems-with" }